Giving
projects a brighter outlook PLANTRAC-OUTLOOK provides exceptional facilities for projects to be planned, scheduled, monitored and managed for profit. INTUITIVE INPUT
Activities/tasks may be input
using a screen Bar Chart, a screen PERT Chart ( Precedence or
Activity-on-Arrow ), a Spreadsheet or a Form. All methods are compatible
and their use may be interchanged to suit. EXCEPTIONAL SCHEDULING Each day saved can mean the difference between profit and loss. The scheduling techniques used have been refined over the years to produce realistic schedules. Critical Path Analysis, Resource Levelling, Resource Limiting, Resource Level-of-Effort and Cost Analysis are all provided. REALISTIC MONITORING Progress reporting have some very useful features. In addition to Actual Start, Actual Finish, Time to Complete and % Complete there are two powerful fields. Anticipated Complete and Continue Work. The former allows a far more reliable measure of progress than % Complete and the latter indicates whether work will continue on this task, now that it has started, or whether a break point has been reached. No changing logic for out of sequence work and consequently deviations from the baseline. Excellent comparison graphics are available for monitoring. IMPRESSIVE REPORTING
Thousands of presentation reports are available from PLANTRAC-OUTLOOK. Complete flexibility is provided to select the required activities, to sequence them and to design the presentation. The reports may be customised with logos, additional pictures and text. In addition to Bar Charts and Tabular Reports, Pert Charts may be drawn in several ways including Time Scaled. Histograms and Graphs are also available for Resources and Trends |